+++*

Symbolic Forest

A homage to loading screens.

Blog : Posts tagged with ‘Bristol Harbour Railway’

Slash, slash, slash

In which spending cuts may be a good thing

Following on from yesterday’s post about government spending cuts: there is, of course, one thing that would save quite a bit more money than freeing up some unused phone numbers. Regular readers of this blog will – especially if they were regular readers about a year ago – be very bored of me droning on about the West Of England Partnership‘s* ongoing guided busway scheme, which consists essentially of turning former and current railway alignments such as the Bristol-Bath Railway Path or the Bristol Harbour Railway into private roads for the exclusive use of First Group, at public cost. Rather high public cost, at that, as for any road scheme; and the first phase of the project would have no purpose other than to replace the current Ashton park-and-ride services with new, less useful, park-and-ride services from the same car park. Follow this link to read more.

Well, the local press has suddenly noticed that cancelling this scheme might be a nice easy way to cut the Department for Transport’s budget down a bit; and other local bloggers have had similar news on another poorly-thought-out local transport scheme. That big hole in the government budget, it appears, is suddenly going to mean no money for new roads, whether that be a replacement for Hartcliffe Way, or paving over the Harbour Railway so that bus routes 903 and 352 can avoid Hotwells Road.**

You might also notice a quote from Councillor Hopkins in that article. “An alternative might be a much cheaper ultra-light rail system, which was tried out on a short stretch of Bristol’s dockside several years ago.” He’s referring to a machine called the Parry People Mover, a small lightweight railcar powered by a flywheel that gets charged up at stops. I don’t see it happening, either. Parry People Movers have been tried at various sites, including the Bristol Harbour railway, but they’ve never seemed to last very long except for one location, Stourbridge (West Mids), a very short line with no intermediate stops. They need a railway line to run on, and reinstating the railway to Ashton Gate then extending it to Ashton Vale would be as expensive, probably, as building a road. Similarly, you couldn’t extend a Parry People Mover line into the city: you’d have to lay tramlines, for one thing, and if you were doing that, you may as well go with a real tram that doesn’t have to wait for a 5- or 10-minute recharge at each stop.

So: a short-for-cash government means no new buses and no new roads. In the long run, no new public transport is a Bad Thing; but new roads, public or private, always mean more traffic, higher emissions, and more oil used up. Hopefully, an enforced pause will mean we can wait for a while, until we can design a transport scheme that’s actually useful, not just one that’s easy.

* I do wonder sometimes what other local councils, like, say, Somerset, Devon, Dorset or Cornwall think of the CUBA local authorities claiming the name “West of England” for themselves and themselves alone.

** Because that, essentially, is all that first phase of the “Bus Rapid Transit” scheme, for all the work it needs, amounts to.

The Detail

In which we look at the detailed plans of the Guided Busway

Long-term readers will recall that, particularly last November, I’ve been covering the local guided busway developments: to whit, the West Of England Partnership, the quango which is, you could say, the haunting ghost of Avon County Council, and its plans to turn an old railway line into a private buses-only road. Sort of. Railway lines, of course, aren’t generally wide enough for that sort of thing; so they will mostly be building half a road.

Well, all has been quiet for a while; the consultation was completed, and the Partnership wrote off to the Department for Transport to say “can we have some money, please? Oh, go on.” A reader of this site, the other day, tipped me off to the fact that WEP have published their persuasions on their website. So, finally, we can read all the details which were conspicuously absent from the public consultation documents.

Firstly, there seems to be a change as to where the money is coming from. In the past, it was mooted that this application would be to the Transport Innovation Fund,* and therefore would need to have a congestion charge element to it. That’s not the case: the application is for Major Scheme Funding. So, no congestion charge: nothing is going to be done directly to reduce traffic. All we get is a new, shiny, park-and-ride service which replaces the still-shiny existing park-and-ride service, but serving Spike Island instead of Hotwells.

Secondly, it includes documentation on service frequencies. And half of the buses using the route won’t be the shiny new “Rapid Transit” buses; they’ll be the same old buses to Weston and Nailsea that already exist. Another thing which isn’t going to make the guided busway scheme any friends: it’s being marketed to the government as the first stage of a Rapid Transit Network, in which it becomes the Ashton Vale-Emerson’s Green route. In other words, the old let’s-pave-over-the-Railway-Path scheme which attracted large amounts of protest.

One of the most interesting bits, though, is the detailed plan of the new route. We learn, for example, that the rather worn and tired old swing bridge across the New Cut is to be “refurbished” – it sounds cheaper, after all – with a new footbridge alongside it. The small Butterfly Junction nature reserve is to be flattened and paved over – it isn’t even marked on the maps – and the Bristol Harbour Railway’s stop there is to be replaced by a new one.

Plan of guided busway at Butterfly Junction

The Bristol Harbour Railway is where it gets most silly. The plans finally confirm what was hinted at in the consultation: it is to be turned into a tramway, with buses running on top of it. According to the bid documents:

The tracks for the heritage railway will be retained to provide for seasonal Sunday services and events such as the Harbourside Festival. When these infrequent events occur, services will run on Cumberland Road.

In other words, trains on the Harbour Railway will run on about half as many days as they do now, and along a tramway, which doesn’t quite tally with what my local councillor has told me in the past. As the railway is only just wide enough for one bus, one bus there will be; outbound buses will run along the road all the time, not just on Sundays. To squeeze under Cumberland Road and keep the cycle path, the busway will be narrowed to a single-track road/tramway with traffic lights.

One of the vaguest parts of the consultation documents was: what happens at Prince St Bridge, which isn’t currently strong enough and probably not wide enough to take buses. The consultation map was hard to read; the Evening Post reported that there would be a new bridge. Some people suspected that the current “trial” arrangement of having cars on one side of the bridge and pedestrians on the other was a taste of things to come, ready for the guided bus scheme. Well, it turns out they were right.

Guided bus plan for Prince St Bridge

Red in that diagram means “bus lane”. Prince St Bridge will be closed to cars; with this scheme, it will be divided between pedestrians on one carriageway, and buses and cyclists on the other. Instead of cyclists being able to run into pedestrians whilst dodging opposing traffic, as now, they’ll be able to get flattened by buses instead. It’s also quite hard to work out how much money has been set aside for Prince St Bridge works, because the costs aren’t itemised very clearly – indeed, the surveyors who reviewed the WEP costings also had trouble on that point.

I don’t think the busway scheme is going to go ahead. That’s partly because the funding bid includes a convenient “low cost alternative” scheme. It is, essentially, the same scheme, same nice new buses, new bus stops, but using the existing park-and-ride route with no new infrastructure. The funding bid says:

A key element of the [Low Cost Alternative] route is the avoidance of the main bridge structures at Ashton Avenue and Prince Street … in order to reduce the construction costs.

The infrastructure will, they say, halve travel times along the park-and-ride route. Whether the Department for Transport think that that will make it worth the money remains to be seen. I’m not convinced they’re going to go for it. In a few months, though, we will all find out.

* as you can see from this Joint Transport Forum presentation released under FOI. Thanks to correspondant Gareth for pointing me to that URL.

The Guided Busway Still Haunts Us

In which, yes, the guided busway is apparently still on the agenda

Yes, it’s back in the news again. The Ashton Vale guided busway route, which I devoted several posts to at the end of last year, has reared its ugly head again. A quick update: the local councils want to convert a chunk of South Bristol railway line – most of which operates as a council-run heritage railway – into a private buses-only road, to replace the current park-and-ride bus route through Hotwells. They had a consultation about it. Now, 7 weeks later, the consultation results are about to be revealed.*

What do they say? From what’s been released so far, not very much at all. Only that the previous rather low price estimate is already on the way up – no surprise there then. It’s confirmed that a new bridge is going to be built alongside Prince St Bridge – that will take a big chunk out of the budget, for starters. But one of the big empty questions from before the consultation – the route the buses will take from there – still isn’t addressed. The planners are also positive that these will be fast, rapid, high-speed buses, because there will be Special Measures to make sure that they don’t get delayed in the city centre – but they have no idea what said Special Measures actually will be. The buses are still due to run along Cumberland Road – a decision which, as I discussed previously, means taking both the Bristol Harbour Railway and most of the width of Cumberland Road and giving it over to the bus route.

Furthermore, there’s still a great silence over where the money’s going to come from, exactly. Because that’s where the problem is, as it happens. Secretly, this isn’t going to be a bus scheme at all, because of how the council want to raise the money. Regular readers can skip ahead, because I’ve talked about this before, too. The money is coming from the Transport Innovation Fund, a body which provides grants for “demand management” schemes – in other words, congestion charging or similar. This new bus route might be being promoted, so far, as a new fast bus route: but at some point, unless the funding radically changes, the truth will pop out from underneath it. This is a congestion charging scheme with buses on top; the congestion charging part has, so far, been kept quiet.

None of this has been mentioned widely as yet. The Evening Post’s reporting has mostly been limited to repeating the relevant press releases, which of course have been rather quiet about this. It’s not surprising that councillor Mark Bradshaw says, according to the paper, that he wants to get the scheme finished as soon as possible. He’s presumably hoping that the funding bid will be written and in the post before anyone asks him what the demand management part of the bid is going to consist of.

* I like the way the Evening Post went with the headline “New Bristol bus route revealed” when barely anything has changed since before the consultation.

More on that guided busway

More on the guided busway, as it paves over the Bristol Harbour Railway and replaces most of Cumberland Road

As promised yesterday, I’ve been doing some closer looking at the West Of England Partnership’s guided busway – sorry, I mean “Bus Rapid Transit” plans, and some measuring up on aerial photos. It seems I made a couple of misconceptions, though. Firstly: some of the plans show the Harbour Railway converted into a sort of tramway running along the same road as the buses. Secondly, I was slightly wrong about the route in the Winterstoke Road area. My mistake was to assume that it might actually serve a residential area; I was wrong, it doesn’t, and its sole use is as a replacement for the current park-and-ride services. The council have also said it will serve the football ground; but that slightly contradicts other things they’ve said.

Anyway, here we go: what does a guided busway actually look like? Never mind the Partnership’s shiny traffic-free plan: here’s a real one. This is the A64 on the outskirts of Leeds, which has a single-carriageway busway down its central reservation.

Aerial shot of East Leeds guided busway

Never mind the bus lanes at top and bottom; the busway is that lovely expanse of concrete in the middle. The width of the whole thing, by my calculations,* comes out at about 3.8m. So, for a two-way busway such as the council wants to build in Bristol, you’re looking at 8m width. That’s for plain road without stops. Here’s a picture of where the council wants to build it: Cumberland Road. To the same scale, as you can tell by the cars.

Cumberland Road, Bristol

From the top: road, railway, cycle track, river.

The plans include building over the railway for one side of the bus route. Remember what Councillor Bradshaw told me: the plans “do not prevent” trains being run. Does that mean no bus services at weekends when the railway’s running? Or fewer trains? Who, at present, knows? Anyway, that means, for our Militant Invective Laboratories simulation (better value that the Partnership’s, I’m sure), we only need paint over part of the road:

Cumberland Road with added busway

There goes the railway and just under 4m of the road, painted over in wobbly freehand. That’s the amount of land the council’s planning to concrete over for its posh new buses (and all the older ones which will also be allowed to use the busway).

So, goodbye to half of Cumberland Road – even by narrowing the pavement on the north side, there wouldn’t be enough room to make the road full-width. The council’s simulation does seem to show there being a bus lane in the road at this point, rather than a proper busway. However, there’s a slight problem with that: the buses and the road traffic would be going in opposite directions, unless one were to drive on the right, so no space gets saved. The published proposals go on and muddy this point by showing both buses and normal traffic driving on the right at this point – which, of course, would be no help at all.

Still to come: the even more awkward pinch-point where the busway is due to run alongside the Portbury Dock railway line, at Winterstoke Road, with a stop which will take up even more space. They seem to be planning to run the busway over Network Rail land – I wondered if Network Rail knew about that, so I’ve asked them. For that matter, I wonder who owns the land the rest of the busway will run on – presumably either Network Rail or BRB Residuary, the organisation that is one of the last remaining stubs of British Rail. BRBR’s website is a bit broken at the moment, so I can’t search their property listings to see what they do or don’t own.

* including the small width of kerb separating bus and road on the buses’ left, which is presumably needed for safety reasons.

Guided Bus

In which we discuss the West Of England Partnership’s misguided bus proposals

Through my door the other day: a leaflet from the West Of England Partnership, the organisation made up of local councils* that replaced the dead and unlamented Avon County Council. It’s about their proposals for a guided busway scheme in this part of the city. A new road, in other words, limited to buses only. Some of the buses on it would be expensive new buses cunningly disguised to look like trams, and running on “sustainable fuel”;** the rest would be the boring ordinary diesel ones that already serve this area. It would replace the current park-and-ride buses in this area, which are already the nicest and most modern buses in this part of the city. So, frankly, I don’t see why that’s the bus route that most urgently needs replacing.*** You can see their proposals for yourself, on the Partnership’s website – they very carefully avoid using the term “guided busway”, and instead call it “rapid transit”, using the word “bus” as little as possible.

The route isn’t really any more useful than the current park-and-ride scheme, either. It’s going to be built along the old railway line that served Bristol Harbour. A small part of this is disused; some is still used by trains to the docks that are still open, but most is used by the Bristol Harbour Railway, a council-owned steam railway that chugs up and down the Avon and the Harbourside, and does a pretty good trade. Here’s an extract from the map on the website:

Proposed bus rapid transit scheme

The purple line there is the new bus route, and the yellow line is the railway. The black blob there, looking like a station, is a proposed Cumberland Road bus stop – handy for Southville, because there’s a footbridge across the river there. The green line is a cycle path.

Now, so far, this is just a line on a map. Not much detail design work seems to have been done – one of the councillors responsible, Mark Bradshaw, said as much to the local paper with the words: “Residents, businesses and other stakeholders are invited to engage in this work and help shape the detail of the proposals.” However, the Partnership have gone as far as producing a mockup of the proposed Cumberland Road bus stop. Here’s their design. On the right: the new bus stop. On the left: a photo I took a few days ago from almost the same location, although I didn’t quite get the angle right.

Cumberland Road

Guided busway proposals

You can see, on my “present day” photo, the railway line – it’s behind the yellow fence and in front of the road, and you can make out the rails if you look carefully. More interestingly, you can see that on the Partnership’s artist’s impression, the railway isn’t there any more. The cycle path along the riverbank is still there; but the railway line on the other side of it has been paved over and turned into busway. So, in fact, has half of the road on the other side – you can see, the busway near the platform comes out almost as far as the centre-line of the road.

Mark Bradshaw is, as it happens, one of the councillors for my ward. I wrote to him, and my other councillor, before I’d realised that he was on the relevant West Of England Partnership committee that has put these proposals forward. Based on that artist’s impression, I wrote:

The project will be hugely expensive in infrastructure costs, [and] will apparently destroy the popular tourist attraction that is the Harbour Railway and replace it with a buses-only road

I must have been writing in Pompous Mode that day. You can see, based on the above, why I’d think that. Councillor Bradshaw replied:

The Harbour train service will continue and the BRT services will not prevent this (see yellow line on map in consultation leaflet)

Which is fair enough – you’ve already seen that yellow line on the map. The problem I have, though, is that building a busway isn’t quite as simple as drawing a line on a map, as the artist’s impression shows. If the Harbour Railway is still going to be there, why did the Partnership put out proposals for consultation that show it paved over? And how is the busway going to fit between the railway and the road? Something will have to be moved, for sure.

If this scheme does go ahead, I strongly suspect that the guided busway along that section of the route will have to be dropped, purely because there isn’t room to build it. In the meantime, I’ve replied to Councillor Bradshaw and asked why that artist’s impression shows the buses running over the site of the railway when the railway is, according to the map, still going to be there; when he replies, I’ll update this post. Tomorrow, I’ll show you – with the aid of Google Maps and existing guided busways – just how much room the proposals would need on the ground, and how much land it might take up.

UPDATE: local blogger SteveL has, in the comments, pointed me to the Partnership’s video of the scheme. Which apparently shows the railway being turned into a tramway along the southbound busway, something that wasn’t apparent on the still images. So, the busway won’t prevent trains from being run, so long as trains only want to run when there aren’t any buses about. I see.

* and “a range of social, economic and environmental partners”, they say. Personally, I think it’s a bit of a grand name for what is, in land area, only a small part of the West of England, but it’s hard to think what else they could have called it – anything with Avon in it was and is taboo, and “Greater Bristol”, although that’s essentially what it is, would no doubt irritate everyone out in the hinterlands.

** They haven’t decided what fuel, only that it will definitely be Sustainable. Buzzwordtastic!

*** except the political reason. This is going to be built in Bristol, but funded partly by the local councils in the surrounding area. Hence, it serves commuters from North Somerset who might want to park-and-ride more than it serves Bristolians.